In order to ensure that your indoor park equipment will be installed smoothly and open on time, we recommend that you do the following 3 points of preparation before installation:

I. Site preparation
1.Keep the ground level:
Please make sure that the ground is level and dry, and can be realized on the ground to avoid the unevenness affecting the stability of the equipment structure during the installation process. If the ground can not use screws, please tell the project manager in advance, using different installation methods for installation.
2.Doors, windows, ceilings and lights need to be installed:
These basic construction should be completed before the installation of the equipment, in order to avoid contamination or damage to the equipment in the later construction process. As well as safety hazards during cross work.
3.Site power, water:
The construction process will use power tools, please tell the project manager in advance of the place to use the plug type and voltage requirements, to facilitate the engineer to use the installation tools can be used to install the work. The site needs to be cleaned in time to prevent dust and garbage from damaging the equipment.

II:Equipment and tools preparation
1.Reserve enough storage space for the goods:
Please arrange a temporary storage area, which must be clean and have enough space to ensure that the goods can be stacked neatly and safely to prevent moisture or damage before installation.
2.Prepare the tools needed for installation:
Such as small cranes, ladders, etc. Imagi team will give customers a complete set of installation tools to be sent to the customer during the transportation of the goods to facilitate the engineers to provide installation services at a later stage. However, small cranes and other tools need to be arranged by the customer to facilitate the engineers to safely work at height and large structures lifting smoothly.

III.Personnel and time arrangement
1.Confirmation of construction time:
Please confirm with our project manager specific construction time, so that the project manager can purchase tickets early to arrange for engineers to arrive at the site within the agreed time, and to ensure that during the installation of the site can be sustained operations, no cross-interference with other construction units. To avoid delays in construction.
2.Arrange the engineer's accommodation:
It is recommended to arrange the engineer's accommodation and three meals per day in advance to protect the construction efficiency and team status.

Warm tips:
Doing the above preparations in advance can not only greatly improve the installation efficiency, but also avoid unnecessary delays and additional costs. If there are uncertainties, please feel free to contact your exclusive project consultant and we will provide you with one-on-one guidance!